Enable or download the Flash player to view this movie. If you are using an HTML editor then you wont see the Flash movie unless you preview this page in your browser.
Don Cederberg
Cederberg Enterprises, Inc.
PO Box #5
Lake Bluff, IL 60044
(847) 615-2007


Email: President@Cederberginc.com

 

Construction of Drain Tile

 

 

 

 

Crew is uncovering a section of collapsed drain tile. 
Drain tile as illustrated is comprised of clay tile. 
Clay tile drainage system estimated at 45 years old
and is in need of cleaning/repair due to sedimentation
and debris.

 

Initial view of clay drain tile post excavation. 
Pipe is cracked and is allowing debris to enter
drainage system, thereby clogging it.  The paved
surface above this portion of clay tile was actually
eroding away identifying a potential problem below.

 


 

A softball-sized hole can be seen to the right of the
photo.  This is due to the drain pipe collapsing, thereby
causing eroding of driveway base.  The driveway was
caving at this point indicating an issue below.

 

 

Back


















www.cederberginc.com
 
Cederberg Enterprises, Inc. PO Box #5, Lake Bluff, IL 60044 (847) 615-2007
 

Copyright 2009 Union Fire Web Design